Source 1
District model · Closure savings workbookNov. 2, 2026 · Summary, D11:G11; assumptions row 5; exclusions rows 16–17
District source directory · District Source DataNov. 14, 2026 · Checked Nov. 14: file directory and revision dates; linked files retain their own dates
District responses / community questions · Sunrise school-based FAQNov. 14, 2026 · Checked Nov. 14: responses to Nov. 5 questions; submitted prompts are not district findings
Community advocacy · Community flyer 3 · Keeping Sunrise costs no moreReceived Nov. 13, 2026
Estimates, not realized savings. Open items are not separately modeled; the workbook says some are generally included in the 5% reduction.
Case A uses projected 2028 resident counts; Case B uses October 2026 enrollment (full-time equivalents), adjusted for boundary moves. Receiving-school utility and custodial increases, assistant-principal changes, and repurposing costs or revenue are not separately modeled. The workbook says some open items are generally included in the 5% reduction. Classroom teachers and planning follow students and are excluded from both sides. The flyer’s “Keeping Sunrise costs no more” is a campaign interpretation, not a completed all-cost finding. Source Data checked Nov. 14 still lists the Nov. 2 workbook; its values have not been recalculated in this update. The Sunrise FAQ Q13/34, checked Nov. 14, promised net annual savings including transportation and separate one-time costs before Feb. 22, then scheduled as the first reading. The first reading is now March 8; the older publication commitment has not been shifted. Its fixed-cost discussion is not the same measure as the net savings plotted here.
Return to reference 1Source 2
District assessment · Facility condition assessmentApr. 25, 2025 · Printed p. 4 (areas), p. 20 Table 8 (2025–29 corrective actions), pp. 27–28 Figure 23 (condition); PDF pp. 11, 27, 34–35
Community advocacy · Community flyer 3 · Keeping Sunrise costs no moreReceived Nov. 13, 2026
District Table 8 totals are $10,688,618 for Sunrise and $17,690,044 for Hollywood Hill. Dividing by 47,481 and 54,215 square feet gives about $225 and $326 per square foot. Figure 23 and corrected Nov. 11 Flyer 3 show Sunrise at 0.40 (Fair); Hollywood Hill is 0.47 (Poor). Lower condition scores indicate fewer repair needs; the index excludes site systems. Sunrise FAQ SS-17 identifies the 2026 reroof; the 2024–25 Annual Report lists completed health room improvements. Project prices and a health-room expansion remain community-reported and unverified. Capital repairs are not annual general-fund savings. Tony’s Nov. 11 source confirmation cites King County roof permit ADDC26-0189 ($307,450, issued May 7, 2026), health-room permit ADDC25-0321 ($168,000, issued August 4, 2025) and portable HVAC permit MECH22-1601 ($25,000, issued August 15, 2022). Original permit records were not independently inspected here; issuance alone does not prove completion.
Repair totals, floor areas and condition scores checked against the district’s April 25, 2025 assessment on Nov. 11, 2026. Fair covers 21–40%; Poor covers 41–60% (printed p. 27). Revised community Flyer 3 received Nov. 13 agrees with the district’s 0.40 (Fair).
Return to reference 2Source 3
District model · Closure savings workbookNov. 2, 2026 · 5% Reduction, C6 and E6
Fixed operating costs differ from net scenario savings and capital repair forecasts.
Before the 5% reduction; excludes special transportation services (STS).
Return to reference 3Source 4
District record · EDAC September 24 deckSep. 24, 2026 · PDF p. 8 replacement list; p. 10 subcommittee options
District responses / community questions · Sunrise school-based FAQNov. 14, 2026 · Checked Nov. 14: responses to Nov. 5 questions; submitted prompts are not district findings
The September 24 deck, p. 8, lists Arrowhead, Hollywood Hill, Westhill, Wellington, Canyon Creek and Moorlands. This finding concerns that list, not every district capital plan. Sunrise FAQ SS-17 says EDAC did not complete a 30-year cost comparison. The 2025 repair forecast has not been adjusted for recent work.
Return to reference 4Source 5
District responses / community questions · Sunrise school-based FAQNov. 14, 2026 · Checked Nov. 14: responses to Nov. 5 questions; submitted prompts are not district findings
District report · 2024–25 Annual ReportNov. 19, 2026 · Capital Bond: recently completed projects, Sunrise health room improvements
District sources checked Nov. 19, 2026: Sunrise FAQ SS-17 identifies a 2026 reroof; the 2024–25 Annual Report’s Capital Bond section lists Sunrise health room improvements among recently completed projects. These establish improvements, not the community-reported project prices or a health-room expansion. County permit references remain community-supplied and were not independently verified; issuance alone does not prove completion.
Return to reference 5Annual modeled savings · exact values in 2026–27 dollars| Case | Scenario 2 · closes Sunrise | Scenario 3 · keeps Sunrise open |
|---|
| Case A | $2,220,829.62 | $2,340,149.88 |
|---|
| Case B | $2,168,523.93 | $2,182,062.10 |
|---|